Straight A’s in Leak Management
Thursday, January 7th, 2010
Case Study What do you do when a school calls with mysterious pools of water in the halls? Project Overview A school contacted Resicom to respond to standing water that had pooled in a high traction hallway. The client needed rapid response to avert any safety hazard posed to students and faculty, while minimizing damage to the building structure itself. Resicom’s ability to quickly respond with a structured action plan would be the differentiator in helping restore the situation back to classes as usual- most likely to the disappointment of students. Scope The scope of work needed to execute this project included: Challenges & Solutions The constraints of the project that were overcome included: Summary Because Resicom took a disciplined approach to systematically determine the source of the leak, demolition and subsequent repairs were minimized. At Resicom we understand the frustrations clients experience when leaks disrupt the normal flow of a facility. Resicom relies on not just our technical expertise, but our structured approach to get things back to normal.
